Design Development | Cost Estimation | 3D Renderings | Construction Documents | Site Planting | Utility Plan | Retaining Wall | Utility Plan | Irrigation Plan | Construction Administration
Project Description
BRECKON landdesign completed landscape design for phases 7 and 8 of the Lakemoor Subdivision including Pamela Baker Park. These additions include restroom facilities, a new swimming pool, approximately 1600 linear feet of multi-use pathway, and stream enhancements. The designs were produced as a team with Loring Evans and Carl Geiger. Carl’s rock wall design expertise was utilized to allow for terracing from the water’s edge to the connection point above on Chinden Boulevard. Phase 7 provides single-family home development while phase 8 includes a mix of commercial facilities fronting Eagle Road, as well as higher density town homes.